Unlacquered Brass Wall-Mount Single-Handle Bathroom Faucet with S-Curve Spout and Straight Lever Handle
- Regular price
- $295.00 USD
- Sale price
- $295.00 USD
- Regular price
-
Made for a bathroom that is used every day, with the weight and the patina of a fixture meant to stay.
Two thin flat round escutcheons on the wall. From the left one a round spout reaches out and flows down in a smooth S curve to a plain open end. On the right, a short cylindrical hub with a plain flat face carries a slim round lever hanging down.
Left unlacquered, the brass is alive. It starts warm and golden, then darkens where hands and water reach it, keeping its light where they do not. Within a few months it settles into a deep amber with darker tones in every recess, a finish no coating can imitate. If you prefer it bright again, a soft cloth and a little brass polish bring it back in minutes.
Cast, turned and finished by hand in solid brass. No plating, no lacquer, no shortcuts.
Specifications
- Material: Solid unlacquered brass
- Finish: Living unlacquered, develops a natural patina over time
- Type: Unlacquered Brass Wall-Mount Single-Handle Bathroom Faucet
- Dimensions: Spout reach 5.9", Spout drop 2.4", Handle offset 4.7"
- Handmade: Yes
- Customization available: Yes
Solid unlacquered brass has a soul. With no sealant to hide behind, it breathes with your home, deepening over time into a warm patina that is yours alone. No two ever age the same way.
- If you love the patina: do nothing. Let it live. A dry cloth after use keeps the tone even as it darkens.
- If you prefer the shine: a minute with brass polish, or lemon and baking soda, brings back the bright gold. Always reversible.
- What to skip: bleach, vinegar, and abrasive pads. They patina the metal unevenly.
Want this piece in a different finish? Just reach out and we will make it for you.
Free shipping to the United States and the United Kingdom, on every order. Orders leave within 2 to 4 business days and arrive 6 to 8 business days later, tracked.
60 days to change your mind. If the piece is not right, contact us within 60 days of delivery and we send you a prepaid return label. Return shipping is on us and there is no restocking fee. The item must come back unused, uninstalled and in its original packaging.
If your order arrives damaged, never arrives, or is not what you ordered, contact us immediately and we make it right at our cost.
Read our Return Policy
Frequently Bought Together
Frequently Asked Questions
Will the unlacquered finish tarnish over time?
Yes and that's exactly the point. We leave our brass and copper bare so they develop a living patina, deepening and warming with everyday use. It isn't damage or a defect; it's the finish maturing into something richer.
Are these really handmade?
Yes, genuinely. Each piece is cast, shaped and hand-finished in small batches, not stamped out on an assembly line. Because a person finishes every one, no two are exactly alike, small variations in the surface and patina are the mark of a piece made by hand, not a flaw.
Are your pieces solid metal, or plated?
Solid, all the way through, solid brass and solid copper, never a thin plating over zinc. That's why our pieces can be polished, refinished and passed down rather than replaced. The metal you see on the surface is the metal throughout.
Do you work with designers and trade projects?
We do. Trade pricing, spec sheets and volume lead times are available on account. See our Trade program.
How long will my order take?
Orders leave our warehouse within 2 to 4 business days and arrive 6 to 8 business days later, tracked. Shipping is free to the United States and the United Kingdom, and you get a tracking number by email as soon as your order ships.
Customer Support
Monday to Friday, 9:00 AM to 5:00 PM Mountain Time. We reply within 1 business day.
60-Day Returns
Take 60 days to live with it. If it is not right, we pay the return shipping and refund you in full.
Free Shipping
Free on every order to the United States and the United Kingdom. Nothing is added at checkout.

